Java, .NET, PHP, PYTHON, ANGULAR, .NET, ML, Data Scince, Testing, CI Tutorials in Easy Languages.

"Best Software Training, Internship, Project Development center of Indore India, Helpline 780506-3968"

Software Testing Life Cycle:-

It provides step by step flow of testing phase to test the application.

STLC has multiple phases for the software testing team.

1) Requirement Analyses:-


this phase is used to provide information on projects based on project modules, component, functionality, specification, time frame, etc.
testing team can meet with the development team, discuss with the client, and analyses and solve all project reflated doubts.

They will study SRS (Software Requirement Specification), BRS(Business Requirement Specification), and FRS(Functional Requirement Specification) documents.

Mostly requirements analyses will be managed by SR. Quality analyst or Test Lead, they will provide and discuss project information to the team .





2) Test Planning:-


In this phase testing, the team will plan about project testing .they will prepare multiple teams to implement a testing operation.

The test planning phase provides and decides the type of testing which will be implemented into the application.
Test Coverage documents will be implemented into test planning.
The process of testing means testing will be manually or some automation tools will be implemented under the testing process will be managed by Test Planning.


Test planning also decides time duration and effort estimation for the complete testing process.


SR TEST LEAD will prepare test plan documents to manage all operations.




3) Test Case Development:-

This phase provides complete documents of the testing process to implement test execution.

Before test case development, first, we decide about the test scenario, the test scenario contains multiple features which will be described as a collection of test cases.


Test Case Development will be implemented by the Test Case Report with the following parameters.

1) TEST SCENARIO

2) TESTING TEAM DETAILS

3)  TEST CASE ID

4)  TEST CASES DESCRIPTION

5)  TEST DATA

6)  EXPECTED RESULT


This will be implemented by the SR. Testers team.


4) Environment Set up for Testing:=

it will check the complete environment for testing depend on the testing process, in case of offline testing then all software requirements and hardware requirements should be satisfied.
we will check the minimum requirements and maximum requirements for environmental testing.

for example, if you check PHP web application on offline mode then APACHE, MYSQL server should be installed in the machine.

We will check the PHP applications on multiple web browsers and multiple operating systems.






5)  Test Case Execution:-

In this stage, we will execute test cases that will be developed under the test case development section by SR. Test lead.

Test case execution decide test result is pass or failed, they will also provide test priority and comment to find out and solve error easily.

Actual Result, Test Result, Test Priority, Tester Comment, Test Execution Date that will be the parameters for Test Case Execution.




6)  Test Cycle Closure:-

It is the last step of STLC when all bug has been solved by the development team and cross-check by the testing team with 90-100% accuracy then the Testing process will be closed.

They will submit a separate Test Closure Report to company and client both.







1 Comments

If you have any doubt in programming or join online classes then you can contact us by comment .

  1. Thank you so much. Your blog is very helpful. Could you please post any material on qa testing services too?

    ReplyDelete

Post a Comment

If you have any doubt in programming or join online classes then you can contact us by comment .

Previous Post Next Post